Road barriers are commonly used around construction areas, temporary work zones and controlled access points to guide movement and clearly separate restricted areas.
For water-filled or crash cushion barriers, correct installation is especially important. The barrier should be placed properly, filled only to the marked water level and handled correctly when it needs to be moved or stored.
Incorrect installation, overfilling, or moving a barrier while it is full of water can affect handling and may damage the barrier or its fittings.
Before installation, make sure the surface is level, the barrier layout is correct, and all units are properly positioned. Once the barriers are in place, follow the correct filling, draining, and handling steps.
Use the checklist below before putting the barriers into use.
1. Install on a Level Surface
Always place the road barriers on a level and stable surface.
An uneven surface can affect the position and alignment of the barriers.
Before installation:
- Check the ground condition
- Remove loose materials
- Make sure the barrier sits evenly
- Align the barriers correctly
2. Connect and Position the Barriers
Place the barriers in the required position before filling them with water.
Check that:
- Barriers are properly aligned
- Connections are secure
- There are no unwanted gaps
- Entry and access areas remain clear
Complete the layout before filling the barriers.
3. Fill Only to the Water Level Mark
Fill the barrier with water only up to the WATER LEVEL MARK provided on the product.
Do not overfill the barrier.
Check each barrier after filling to make sure it remains correctly positioned.
4. Do Not Move a Water-Filled Barrier
Do not move the Crash Cushion Barrier while it is filled with water.
If the barrier needs to be relocated:
- Drain the water first.
- Move the empty barrier.
- Position it correctly.
- Refill it to the water level mark.
5. Drain the Water Before Moving
To drain the barrier, open the outlet plug provided on the side of the barrier.
Allow the water to drain completely before moving or storing the unit.
6. Secure the Outlet Plug
After draining, close the outlet plug tightly.
Make sure the plug is properly secured to help avoid water leakage when the barrier is filled again.
Final Installation Check
Before use, confirm:
✓ Barrier is installed on a level surface
✓ Barriers are properly aligned
✓ Connections are secure
✓ Water is filled only to the marked level
✓ Outlet plug is properly closed
✓ Access areas remain clear
✓ No damaged barriers are being used
Important Handling Instructions
DO:
- Install on a level surface
- Fill only to the water level mark
- Drain completely before moving
- Secure the outlet plug after draining
DO NOT:
- Overfill the barrier
- Move the barrier while filled with water
- Leave the outlet plug loose
- Install on an uneven surface
Dubai Polymer Road Barriers
Dubai Polymer supplies plastic road barriers for temporary work zones, construction sites and project requirements across the UAE.
For product dimensions, availability and pricing, contact Dubai Polymer with your required model, quantity and project location.
Frequently Asked Questions
1. Can I move the barrier after filling it with water?
No. Drain the water completely before moving the barrier.
2. How much water should I add?
Fill only up to the water level mark provided on the barrier.
3. How do I drain the barrier?
Open the outlet plug located on the side of the barrier and allow the water to drain.
4. What should I do after draining?
Secure the outlet plug tightly before the barrier is used again.
5. Does the installation surface need to be level?
Yes. The barrier should be installed on a level surface.